top of page
WhatsApp Image 2024-07-15 at 07.04.24.jpeg

CONSULTANCY SERVICES FOR THE PREPARATION OF A MASTER PLAN FOR UTILIZING VIRTUAL PIPELINE TECHNOLOGY FOR SCALING UP CNG AND MINI LNG AS ALTERNATIVE FUEL FOR THE TRANSPORT SECTOR COUNTRYWIDE.

CLIENT: Tanzania Petroleum Development Corporation (TPDC)

In 2025, APY KEGS Energy Services Ltd, in partnership with Africa International Advisors (AIA), began a national consultancy project for TPDC to develop a master plan for virtual pipeline technology. The project aims to scale up the use of Compressed Natural Gas (CNG) and Mini Liquefied Natural Gas (LNG) as alternative transport fuels across Tanzania. The scope includes strategic planning, infrastructure mapping, and development of policy and investment frameworks. This initiative promotes cleaner energy, reduces reliance on conventional fuels, and supports Tanzania’s transition to a more sustainable transport system.

WhatsApp Image 2024-08-03 at 08.59.41.jpeg

CONSULTANCY SERVICES FOR UNDERTAKING FEASIBILITY STUDY WITH FRONT END ENGINEERING DESIGN (FEED) AND ESIA FOR DAR TO CHALINZE TRANSMISSION PIPELINE.

CLIENT: Tanzania Petroleum Development Corporation (TPDC)

In 2024, APY KEGS Energy Services Ltd, together with Gulf Interstate Engineering (GIE), began consultancy for Tanzania Petroleum Development Corporation (TPDC) on the Dar es Salaam to Chalinze Transmission Pipeline. The project covers route identification, feasibility study, Front-End Engineering Design (FEED), and detailed Bills of Quantities (BOQ) with cost estimates. It also includes a full Environmental and Social Impact Assessment (ESIA) to ensure compliance and sustainability. This initiative advances Tanzania’s gas infrastructure and reflects APY KEGS’ commitment to responsible energy development.

WhatsApp Image 2024-07-15 at 07.08.03.jpeg

SURVEY, COMPENSATION VALUATION, LAND ACQUISITION AND PERMITTING FOR CHIKUMBI-1 WELL SITE, NTORYA-3 LOCATION, AND ACCESS ROAD.

CLIENT: ARA Petroleum Tanzania Ltd

In 2024, APY KEGS Energy Services Ltd successfully completed a land access project for ARA Petroleum Tanzania Ltd, in collaboration with White Knight Real Estate Investment Analysts Company Limited. The assignment covered surveying, compensation valuation, land acquisition, and permitting for the Chikumbi-1 Well Site, Ntorya-3 location, and the associated access road within the Ruvuma Basin. APY KEGS ensured adherence to land regulations and actively engaged local stakeholders and authorities throughout the process. The project facilitated timely site preparation for petroleum exploration while minimizing disruptions, reflecting APY KEGS strong capability in delivering compliant and community focused land solutions.

bottom of page